• Case study of a large-scale solar, wind and hydro power hybrid system in Skibotndalen, Troms 

      Ingebrigtsen, Karoline (Master thesis; Mastergradsoppgave, 2017-06-06)
      The power company Troms Kraft is interested in the feasibility of a large-scale hybrid system in Skibotndalen in Troms. There are two existing hydro power stations in the area, and this thesis concerns the addition of an electric solar power plant of 20 MW and a wind power plant of 21 MW to these stations. As measured solar radiation is not available for one whole year at the location, solarradiation ...
    • Muliggjørende teknologi og rammebetingelser 

      Sæle, Hanne; Grande, Ove Steinar; Ingebrigtsen, Karoline; Ahcin, Peter (Research report; Forskningsrapport, 2018-02-19)
    • Rethinking the role of solar energy under location specific constraints 

      Eikeland, Odin Foldvik; Apostoleris, Harry; Santos, Sergio; Ingebrigtsen, Karoline; Boström, Tobias; Chiesa, Matteo (Journal article; Tidsskriftartikkel; Peer reviewed, 2020-09-22)
      In this manuscript we evaluate the potential of photovoltaic systems to meet some dedicated energy demand in specific geographic locations. Our approach is based on location-specific constraints rather than on pre-established, location-independent methodologies or assumptions. First, we propose that a thorough analysis of the socio-economic and technical possibilities of a location must act as the ...